Máquina para fabricar bloques de hormigón production line as a new type of environmental protection machinery and equipment, en el mercado de la máquina de ladrillos ha sido ampliamente reconocido y aplicado. Actualmente, Se ha convertido en el principal equipo de producción en el campo de los materiales de construcción de protección ambiental.. Hoy, Xiaoding will take you to understand the details of the inspection work before the use of the concrete block making machine production line and the operation method during the start-up operation.
Check Work Before Power On:
1. Check the power problem before turning on
Concrete block equipment adopts a fully automatic production process, y la electricidad es uno de los factores de seguridad que no se pueden ignorar. In order to avoid some non-human factors equipment damage caused by circuit problems, to ensure production safety. Por lo tanto, before the boot to check whether each wire is intact, bad to be replaced in time.
2. Check equipment wear
Concrete block equipment, especially the equipment that has been in production for more than one year, according to the statistical law of component wear, maintenance is carried out before the components reach normal wear and aging, to find and eliminate hidden dangers, to avoid late damage of equipment, and to ensure the normal operation of the assembly line.
3. Material debris hard inspection
Can not start the feeder equipment, to avoid overload phenomenon, resulting in damage to equipment parts. Carefully check whether the material produced is doped with larger substances, especially iron solid items, to avoid damage to the mold or other equipment is indirectly damaged.
4. Verification of cleaning and maintenance of spare parts
Before starting the machine, you should first check whether the screws of each part are loose, and apply lubricating oil to each part. After shutdown and shutdown, every corner of the equipment should be cleaned to prevent trivial debris from falling into the equipment and causing abnormal operation or aging acceleration.
5. Cleanup of unrelated personnel
Install all protective covers, cubiertas de piso y redes de sellado por adelantado. Está estrictamente prohibido que los no operadores se acerquen o pongan sus manos o escombros directamente en las redes de sellado. And clean up the scene before the start of the work has nothing to do with the staff, especially in the direction of the motor is strictly prohibited, Para evitar accidentes de seguridad.